Fig 1: Ashfield District Councillor, David Ayres (centre) with Robin Hood and Maid Marion characters at Sutton Parkway Station on the Robin Hood Line Fun Day on 19th November 1995. Photo Credit – SB2K archive
Robin Hood Line: Stage 2 opening 30th anniversary
Thirty years ago, on 20th November 1995, regular timetabled passenger trains returned to Ashfield and Mansfield after a gap of thirty-one years when Stage 2 of the Robin Hood Line opened. Stage 2 extended services from Newstead to Mansfield Woodhouse with stations being opened at Sutton Parkway, Mansfield and Mansfield Woodhouse. Kirkby-in-Ashfield station opened a year later on 18th November 1996.
Fig 2: A Nottingham bound Class 156 Sprinter in BR Regional Railways livery passes through Kirkby-in-Ashfield in late 1995. Photo Credit – Alan Slater
Robin Hood Line Fun Day
The day previous to regular timetabled passenger trains being introduced, a special Fun Day took place on Sunday, 19th November 1995. Packed trains ran between Nottingham and Mansfield Woodhouse and vice versa with many additional activities taking place at various locations along the line.
Fig 3: Leaflet for the Robin Hood Line Fun Day on Sunday, 19th November 1995. Source – David Amos collection
The local Chad newspaper reported;
‘Passenger services on Britain’s newest railway line began in earnest this week after a break of 31 years, one month and 10 days…clear skies brought huge crowds out at Sunday’s Fun Day and extra services were hastily added as demand for services outstripped expectations’.
Fig 4: Crowds at Sutton Parkway Station on the Robin Hood Line Fun Day, 19th November 1995. Photo Credit – SB2K archive
Fig 5: Robin Hood Line ticket for the Fun Day on Sunday, 19th November 1995. Source – David Amos collection
Stage 2: Regular Timetabled Passenger Trains
Regular timetabled passenger rail services commenced on Monday, 20th November 1995 with the first northbound train departing Sutton Parkway for Mansfield Woodhouse at 06.17 am with the first southbound to Nottingham departing at 06.47 am. Sutton Parkway, although situated at Kirkby Hardwick, is the fifth railway station in the history of Sutton-in-Ashfield’s railways
Fig 6: Robin Hood Line Stage 2 leaflet and rail tickets from the first day of timetabled trains on 20th November 1995. Source – David Amos collection
A survey made two years after the opening of Stage 2 revealed that 40% of journeys from the Mansfield area had not been made prior to reopening. As Anderson and Cupit stated, this was a clear indication that the principal aim of providing people with the means of travelling for employment elsewhere was being fulfilled. A main reason for reinstating rail passenger services was economic regeneration following the decline in the local staple industries of textiles and coalmining since the 1960’s.
Fig 7: A Mansfield Woodhouse bound Class 156 Sprinter in BR Regional Railways livery at Sutton Parkway station in late 1995. Photo by David Amos
A new improved half hourly service on Saturdays was introduced in 1997. Following a public consultation in 2007 a Sunday service was introduced with trains running between Mansfield Woodhouse and Nottingham and vice-versa.
With the single line from Bestwood Park Junction to Kirkby South Junction forming part of the route the timetable was obviously devised to cater for the Robin Hood line trains between Nottingham and Mansfield Woodhouse. However, in early 1997 there was a Saturday timetable slot which enabled a charter train to use the route heading north. Two such instances can be seen below in Figs 7a, 7b and 7c.
Fig 7a: 33116 “Hertfordshire Rail Tours” & 33051 “Shakespeare Cliff” on the climb towards Kirkby tunnel with the 33111 Charters 1Z33 07:32 London Kings Cross to Scarborough “Robin Reliant”. 15th February 1997. Photo by Malcolm Rush
Fig 7b: 33116 “Hertfordshire Rail Tours” & 33051 “Shakespeare Cliff” on the climb towards Kirkby tunnel with the 33111 Charters 1Z33 07:32 London Kings Cross to Scarborough “Robin Reliant”. 15th February 1997. Photo by Malcolm Rush
Fig 7c: 33116 “Hertfordshire Rail Tours” & 33051 “Shakespeare Cliff” approach Kirkby Lane End Junction with the Hertfordshire Rail Tours 1Z33 08:33 London Kings Cross to Skegness “Swineshead Revisited”. 22nd March 1997. The line from Pye Bridge can be seen on the right. Photo by Malcolm Rush
What goes around, comes around! The Robin Hood Line 1960’s and 1990’s.
An old local saying is “What gus r’ound, cums r’ound!” which translated means “What goes around, comes around!” The meaning behind this saying is the more things change, the more they stay the same!
The following is a gallery of images of the Robin Hood line around Kirkby-in-Ashfield making comparisons with the various locations in the early 1960’s and the mid 1990’s
Fig 8: Sprinter combination on the route of the former Great Northern Leen Valley Extension line at Kirkby-in-Ashfield on the Robin Hood Line Fun Day, 19th November 1995. Photo by David Amos
Fig 9: Black 5 4-6-0 on a PW train on the Great Northern Leen Valley extension line at Kirkby-in-Ashfield in the mid 1960’s. Note the coal train passing underneath on the Kirkby to Pye Bridge route. This section of line closed when the 1972 Kirkby deviation line opened on 4th April 1972. Photo Credit – David K Dykes
Fig 10: A Nottingham bound Sprinter combination at Kirkby-in-Ashfield on the Robin Hood Line Fun Day on 19th November 1995. Photo by David Amos
Fig 11: A Class 8F 2-8-0 on a freight train about to enter the north portal of Annesley Tunnel in the mid 1960’s. This is the same location as Fig 10 looking north from Grives Lane. The Robin Hood Line passes here at a higher level, more or less above the former Great Central line. Photo Credit – David K Dykes.
Fig 12: Nottingham bound Central Trains Class 150 Sprinter about to pass under Kingsway bridge in 1996. Photo by David
Fig 13: Fairburn 2-6-4T with a Worksop to Nottingham train about to pass under the old Kingsway bridge in 1964. Photo Credit – David K Dykes
Fig 14: Nottingham bound Class 150 Sprinter emerging from the south portal of Kirkby Tunnel in 1996. Photo by David Amos
Fig 15: Stanier Class 3 2-6-2T emerging from the south portal of Kirkby Tunnel in the late 1950’s with a Nottingham Midland bound train. Photo Credit – unknown
The Robin Hood Line and the Ghost of the Great Central!
Just north of the Grives Lane crossing, the Robin Hood Line passes very close to the Great Central line but at a much greater height (Fig 16). This is a 1994-95 built section of Railtrack line which links the 1848 Midland Leen Valley line with the route of the 1898 Great Northern Leen Valley Extension north of Lindley’s Lane. Between Kirkby Tunnel and Sutton Parkway the Robin Hood Line covers just over 200 years of railway history in 2 miles! More about this in a later blog.
Fig 16: The Robin Hood Line and the Ghost of the Great Central at Kirkby-in-Ashfield. Animation by John Allcock
Blog by David Amos and Malcolm Rush
Posted 8th November 2025
References
Anderson, P. & Cupit, J. An Illustrated History of Mansfield’s Railways, 2000.
Chad Newspaper, It’s Rush Hour at the Parkway, 23rd November 1995.
Nottinghamshire County Council, Robin Hood Line Facts Sheets, 1997