Oral history workshop

Fig 1: Ratcliffe power station in the 1970’s. Photo Credit: Alf Henshaw

Pits to Power Stations 

Ratcliffe Power Station, the UK’s last coal fired power station, finished generating on 30th September 2024 ending over 140 years of coal fired electricity generation in the UK. Ratcliffe and other Trent Valley coal fired power stations had a strong connection with the Ashfield area. The local collieries supplied the Trent Valley power stations with coal for many years until the last local colliery, Annesley-Bentinck, closed on 30th January 2000. In the 1970’s the Trent Valley was known as ‘Mega Watt Valley’.

Oral history workshop

Fig 2: Brush Type 4 (Class 47) passing the Acre at Kirkby-in-Ashfield with a rake of then new MGR coal wagons in the late 1960’s. Photo Credit – Keith Murray collection

From the late 1960’s, Merry Go Round coal trains (MGR’s) were introduced to run directly between local collieries and the Trent Valley coal fired power stations without any need for intermediate marshalling. These were introduced as a result of the 1963 ‘Reshaping of British Railways’ report more commonly known as the ‘Beeching Report’ after its author, Dr Richard Beeching. The idea was to load and discharge whole train loads of coal on the move. Many of the Trent Valley coal fired power stations were equipped for automated MGR discharging of coal. Gradually through the 1970’s, the National Coal Board (NCB) installed Rapid Loading Bunkers at many local collieries to speed up the loading process at the colliery end.

Oral history workshop

Fig 3: Bentinck Colliery in 1991 with a MGR coal train loading up under the Rapid Loading Bunker. Photo Credit – MuBu Miner collection

This image gallery looks at the ‘Pit to Power Station’ journey for local deep mined coal from Bentinck Colliery to Ratcliffe Power Station. From the early 1980’s Annesley Colliery sent its coal via underground conveyors to Bentinck Colliery and for a short period in the last two and a bit years of its life (1984-1987), coal from Newstead Colliery also travelled to Bentinck via underground conveyors and the Bentinck surface drift. The Bentinck Rapid Loading Bunker dispatched coal to local power stations by rail for 23 years from 1977 to 2000 at a rate of 1.5 to 2 million tons per annum. Power station coal was usually referred to as ESI coal – Electricity Supply Industry.

Oral history workshop

Fig 4: 1971 wagon destination card Bentinck Colliery to Ratcliffe power station. Photo Credit – Graham Upchurch

Oral history workshop

Fig 5: MGR coal wagons at Bentinck Colliery coal preparation plant in 1973. Photo Credit – Kirkby Heritage Centre

Oral history workshop

Fig 6: MGR wagon slow speed controllers at Bentinck Colliery in 1973. Photo Credit – Coal Authority

Oral history workshop

Fig 7: Bentinck Colliery Rapid Loading Bunker under construction in 1977. Photo Credit – MuBu Miner collection

Oral history workshop

Fig 8: Interior of Bentinck Colliery Rapid Loading Bunker at the top. Photo Credit – MuBu Miner

Oral history workshop

Fig 9: Class 58 about to pass under the Bentinck Colliery Rapid Loading Bunker with MGR empties in February 1994. Photo Credit – MuBu Miner

Oral history workshop

Fig 10: Same Class 58 waiting to go under the Bentinck Rapid Loading Bunker to the headshunt in preparation for slow reversing whilst the coal is loaded. Photo Credit – MuBu Miner

Oral history workshop

Fig 11: Class 58 reversing MGR wagons under the Bentinck Rapid Loading Bunker during coal loading operations in the early 1990’s. Photo Credit –SB2K archive.

Oral history workshop

Fig 12: Loading MGR wagons with ES1 coal at Bentinck Colliery in the 1990’s. Photo Credit – MuBu Miner collection.

Oral history workshop

Fig 13: MGR coal wagons passing under the Bentinck Colliery Rapid Loading Bunker during loading in 1993. Photo Credit – MuBu Miner

Oral history workshop

Fig 14: One of the chutes at the Bentinck Colliery Rapid Loading Bunker loading ESI coal in 1993. Several 32 tonne MGR wagons could be loaded simultaneously as the train passed under the Rapid Loading Bunker at very slow speed. Photo Credit – MuBu Miner

Video Clip: Class 56 loading up at the Bentinck Colliery Rapid Loading Bunker when new in 1977. (2 mins, 7 seconds) Video credit – John Robinson. 

Oral history workshop

Fig 15: Class 58 now loaded with ESI coal reversing prior to running around the wagons in the Bentinck Colliery sidings before departing for Ratcliffe Power Station. Photo taken from the steps at the top of the Rapid Loading Bunker. Photo Credit – MuBu Miner

Oral history workshop

Fig 16: Class 58 loaded with coal revering to the sidings after loading up at Bentinck Colliery Rapid Loading Bunker. Photo Credit – Don Walker

Oral history workshop

Fig 17: Class 58 running around the full parked MGR’s at Bentinck Colliery in preparation to attach to the front end and take the coal to Ratcliffe power station. Photo Credit – Kirkby Heritage Centre

‘Steaming Back to Kirkby’ project coordinator and former Annesley miner, David Amos, recalls the significant impact that Ratcliffe power station had on his life;

“As a youngster in the 1960’s, I remember Ratcliffe power station being built when my Dad used to take me trainspotting nearby. Later, in 1974 when I started work at the pit, the vast majority of the coal went by rail to the Trent Valley power stations. In the late 1980’s and early 1990’s I was part of two official British Coal visits from Annesley-Bentinck colliery to Ratcliffe power station.

The icing on the cake was in 1993 when I had an official cab ride in a Class 60 taking the coal from Bentinck Colliery Rapid Loading Bunker to Ratcliffe power station and the empties back to Toton sidings. It meant that I had done the whole coal journey from the coal faces at Annesley-Bentinck colliery, via the underground conveyor roadways and bunkers, the Bentinck surface drift, Coal Preparation Plant and Rapid Loading Bunker to the power station (but not all in one day!).

Oral history workshop

Fig 18: Class 58 passing the site of the former Langton Colliery with a Bentinck Colliery to Ratcliffe Power Station MGR coal train in February 1994. Photo Credit – MuBu Miner

Oral history workshop

Fig 19: View out the cab of a Class 60 at New Selston level crossings on a MGR coal train from Bentinck Colliery to Ratcliffe power station in 1993. Photo Credit – MuBu Miner

Oral history workshop

Fig 20: Class 58 on a MGR coal train at Pye Bridge Junction in the early 1990’s. Photo Credit – MuBu Miner

Oral history workshop

Fig 21: Class 60 passing through Langley Mill, Derbyshire with MGR wagons fitted with canopies en-route for one of the Trent Valley coal fired power stations in the early 1990’s. Photo Credit – MuBu Miner

Oral history workshop

Fig 22: MGR coal train at a coal fired power station in the 1970’s. Photo Credit – MuBu Miner collection

Oral history workshop

Fig 23: Double headed Class 20’s at Ratcliffe power station with a MGR coal train from a local colliery in 1991. Photo Credit – Richard Bull

Oral history workshop

Fig 24: MGR coal wagon unloading mechanism. Photo Credit – Richard Bull

Oral history workshop

Fig 25: Ratcliffe Power Station generating in 2022. East Midlands Parkway railway station is located adjacent to the power station .Photo Credit – MuBu Miner

Oral history workshop

Figure 26: Ratcliffe Sunset and the end of coal fired electricity generation in the UK.. Photo Credit – Ian Castledine

Blog and image gallery by David Amos

Posted by SB2K admin – 14th October 2024.