Fig 1: Constructing Stage 2 of the Robin Hood Line at Kirkby-in-Ashfield in 1994. Photo Credit – SB2K archive
Building Stage 2 of the Robin Hood Line at Kirkby-in-Ashfield
The Robin Hood line was a phased reintroduction of rail passenger services between Nottingham and Worksop, and vice-versa, between 1993 and 1998. Services last ran on 10th October 1964 and were withdrawn as part of the rail cuts from the 1963 Beeching Report (see Blog, Last Passenger Trains at Station Street 1964 @ https://kirkbysteam.co.uk/last-regular-passenger-trains-at-station-street-10th-october-1964/
Stage 2, which linked Newstead with Mansfield Woodhouse, involved digging out Kirkby Tunnel and its associated cuttings and building a new section of line through Kirkby-in-Ashfield. Construction of this line took place between March 1994 and October 1995.
Fig 2: Ceremony at Newstead for the opening of Stage 1 of the Robin Hood Line on 17th May 1993. Photo Credit – Chad newspaper collection
Stage 1 Robin Hood Line: Nottingham to Newstead
Stage 1 opened on 17th May 1993 and reintroduced rail passenger services between Nottingham and Newstead. The route was along the former Midland Leen Valley line which was last used for coal trains north of Bestwood Park in March 1988 when Linby Colliery closed. The line north of Linby had been abandoned since September 1983 when coal last left Newstead Colliery by rail. New stations on Stage 1 opened at Newstead and Hucknall with Bulwell coming on stream on 23rd May 1994.
Fig 3: Map showing planned construction of the new Kirkby rail link as part of Stage 2 of the Robin Hood Line. Source – David Amos collection
Building Stage 2 of the Robin Hood Line at Kirkby-in-Ashfield
Stage 2 involved reinstating rail passenger services between Newstead and Mansfield Woodhouse, putting Mansfield back on the national passenger rail network after a gap of thirty-one years. During this time it was one of the largest populated towns in Britain without a direct rail link. Stage 2 involved constructing a new 2.5 mile stretch of line between Newstead and a junction with the Pye Bridge freight only line near to Victoria Road Bridge.
Fig 4: Kirkby tunnel and its associated cutting, dug out in 1994 and a new road bridge installed at Kingsway. Photo Credit – SB2K archive
Pivotal to this was reopening the 199 yard former Midland tunnel under the Robin Hood Hills at the Shoulder of Mutton. The tunnel dated from 1848 when the Leen Valley route from Nottingham to East Kirkby opened. The original line between Kirkby Station Junction and Annesley Warren was closed in October 1970 severing the direct Nottingham – Worksop route.
Fig 5: Building the new bridge to take Stage 2 of the Robin Hood Line over Lindley’s Lane in 1995. Photo Credit – SB2K archive
As Anderson and Cupit stated, Stage 2 was a huge undertaking, costing in the region of £20 million pounds. It was funded by Central Government and Nottinghamshire County Council with other sources of funding coming from the European Union, British Rail and various local authorities based along the route of the line.
Fig 6: Birse Construction starting to excavate Kirkby Tunnel in 1994. Photo Credit – SB2K archive
The construction work for Stage 2 was overseen by the Major Project Division of Railtrack, which came into existence on 1st April 1994 as part of the reprivatisation of Britain’s railways in the mid 1990’s. The contract for the work was awarded to Birse Construction Limited.
Fig 7: Robin Hood line trackbed in Annesley Warren during construction of Stage of the Robin Hood Line in 1994. Photo Credit – SB2K archive
The Newstead to Grives Lane stretch utilised the 1848 disused trackbed of the Midland Railway’s Leen Valley route, through Kirkby Tunnel and under Kingsway bridge. A new road bridge was installed at Kingsway and a crossing at Grives Lane. From here a new section of line closely followed the route of the old Great Central main line, but at a higher level. A new over- bridge was constructed at Lindley’s Lane (Fig 5) taking the line above it whereas previously the Great Central main line here passed underneath.
Fig 8: Excavated cutting on the former Great Northern Leen Valley Extension line in 1994 as part of Stage 2 of the Robin Hood Line. Photo Credit – SB2K archive
Work north of Lindleys Lane followed the route of the Great Northern Leen Valley Extension Line, which had closed on 27th May 1968 (Fig 8). This was complicated because of domestic waste which had been used to fill the cutting in the 1970’s. The remaining waste not excavated under the trackbed had to be compacted and capped, with a ventilation system being installed to allow for any potential methane gas to escape.
Fig 9: Earth moving as part of the construction of Stage 2 of the Robin Hood Line at Kirkby-in-Ashfield in 1994. Photo Credit – SB2K archive
A very wet autumn / winter 1994-1995 caused difficulties with earth moving and put back the planned opening of Stage 2. (Fig. 9).
Fig 10: Construction of Kirkby Lane End Junction in 1994. Photo Credit – Chad newspaper collection
The line was single track from Newstead to a point just north of Grives Lane, at a new Kirkby South Junction, where it became double track, joining the Pye Bridge line further on at Kirkby Lane End Junction.
Fig 11: Class 58 No 58030 just after passing through Kirkby Tunnel, the first loco to pass through since its closure in October 1970. Photo Credit – Chad newspaper collection
Trackwork on the new section of line through Kirkby-in-Ashfield was completed in September 1995 and the first train to travel on it was Class 58 No. 58030 which passed through light engine on 24th September 1995. (Fig 11). It was the first loco to pass through Kirkby Tunnel since the line closed in October 1970.
Fig 12: Passing loop north of Newstead Station on the Robin Hood Line. Photo by David Amos
The long single stretch of line between Grives Lane and Bestwood Park became problematic with late running trains, therefore a passing loop was installed north of Newstead station at a later date (Fig. 12)
Fig 13: Construction at Sutton Parkway station in 1995. Photo Credit – SB2K Archive
Stations on Stage 2 were constructed at Sutton Parkway, Mansfield and Mansfield Woodhouse, the latter having a bay platform incorporating an old Midland Goods Shed. Kirkby-in-Ashfield station opened a year later, on 18th November 1996, following campaigning by Kirkby and District Conservation Society, led by the late Sylvia Sinfield. (See Ian Handley’s blog, ‘First Rail Ticket at Kirkby-in-Ashfield since 1964’ https://kirkbysteam.co.uk/first-rail-ticket-at-kirkby-in-ashfield-since-1964/ )
A family fun day took place on Sunday, 19th November 1995 with regular, timetabled passenger trains commencing the day after on Monday, 20th November 1995, putting Ashfield and Mansfield back on the national rail passenger network after a gap of thirty-one years.
Fig 15: Late 1990’s aerial view showing Stage 2 of the Robin Hood Line between Annesley Warren (top) and Lindley’s Lane (bottom). The route of the former MSL / GC route through Annesley Tunnel can be clearly seen. Photo Credit – Kirkby Heritage Centre
Blog by David Amos
Posted – 28th October 2025
References
Anderson, P. and Cupit, J. An Illustrated History of Mansfield’s Railways, 2000.
Nottinghamshire County Council, Robin Hood Line Fact Sheets, 1998.
RCTS, A Travellers Guide to the Robin Hood Line, 1998.